- Preferred Labelskos:prefLabel
upstream dam
- URI
- https://pid.geoscience.gov.au/def/voc/ga/MiningWasteStructureType/upstream_dam ↗Go to the persistent identifier link
- Within Vocab
- Mineral Resources - Mining Waste Structure Type
Preferred Labelskos:prefLabel | upstream dam |
---|---|
Definitionskos:definition | Containment walls are constructed, usually in a series of stages, in an upstream direction. Construction begins with a starter dam which forms the foundation for subsequent levels as the dam is raised. Each new dam level is built on the inside or ‘upstream’ of the previous dam wall. |
See AlsoseeAlso | Mineral Resources - Mining Waste Structure Type |
History NotehistoryNote | This concept is used in a Geoscience Australia Mineral Resources database table (OZMIN.LU_WASTE_STRUCTURE_TYPES) |
Is Defined ByisDefinedBy | Mineral Resources - Mining Waste Structure Type |
Alternate Profiles
Different views and formats:
Alternate Profiles ?Profiles (alternative information views) encoded in various Media Types (HTML, text, RDF, JSON etc.) are available for this resource.